When a framework has more levels than the work has
Five levels look tidy on a chart and collapse in the rating. A blind test on real incidents shows which levels a manager can actually separate.
Rajendra Kumar · 25 November 2026 · 9 min read

Representational image.
A branch manager in a distribution company sat across from me with the appraisal form for one of his supervisors. Nine competencies, five levels each, forty-five rows. He had filled in level 3 for thirty-one of them.
I asked him to describe the difference between level 3 and level 4 for "Ownership". He read the anchors out loud. Then he said, "the level 4 one is for people who do it without being told." I asked which of his six supervisors did the job without being told. He named two. Neither had scored 4.
That is the honest shape of the problem. He was not lazy and the framework was not stupid. The scale asked him to make a judgement he had no evidence for and no practice making, forty-five times, in one sitting. So he did what anyone does when a scale is finer than the information: he collapsed it into "fine" and moved on.
Five levels is an assertion about your raters, not about your work
A level is a claim that two people doing this job can be told apart by what they are seen to do, and that a manager watching both of them will point to the same difference. Most frameworks assert that four or five times over, in a table, and never test it.
The psychometrics on this are not ambiguous. Lozano, García-Cueto and Muñiz simulated rating scales with two to nine response options and concluded that four is the minimum for acceptable reliability, and that beyond seven points the gains are scarce. Their second finding is the one that matters for frameworks: if the number of options exceeds the raters' capacity to discriminate between them, you are not adding precision, you are adding measurement error.
Behavioural marker systems in medicine give a live demonstration. Smith and colleagues put clinically experienced faculty and near-peer raters through a familiarisation session on a behavioural marker tool, then had them rate three scripted performances built to be clearly good, mediocre and poor. The experienced group reached an intraclass correlation of 0.60, described in the paper as good. The near-peer group reached 0.38. Nine raters, three performances designed to be far apart, a tool built for exactly this, and the experienced group still only landed on "good". That is the ceiling you are working against when you ask a line manager in a plant to place a person at level 4 rather than level 3.
The question your framework has not answered
There are two different questions hiding inside "does this framework work", and they need different tests.
The first is whether the words mean the same thing to two people. That is what a retranslation exercise tests: strip the labels, hand the anchors around, see whether managers sort them back into the same competency and the same level. It is worth doing, and the build sequence that survives a retranslation test covers it.
The second question is whether two adjacent levels describe different work at all. You can pass retranslation and fail this completely. Every manager may agree that level 3 means "does it with supervision" and level 4 means "does it without", and still be unable to produce, from their own team, one example that lands cleanly in 4 and not in 3. The anchors are distinct as sentences and empty as distinctions. That is a level your organisation cannot support, and no amount of anchor polishing will fix it.
So test it directly. Here is the procedure I use.
Step one: collect incidents, not anchors
Write down nothing about the framework. Instead collect forty to sixty short written incidents from the work itself: one paragraph each, describing something that actually happened, with names and department removed. "The valve inspection on line 3 was signed off two days late and nobody noticed the second gauge was out of calibration" is an incident. "Demonstrates attention to detail" is not.
Draw them from the whole range of performance, including the bad end. Ask supervisors and the people who fix problems to write them. A vignette bank built only from good performances cannot test your top level, because there is nothing at the top to confuse it with.
This is the expensive step and it is why the test rarely gets run. Two people, one week, forty incidents. You will reuse the same bank for years, and it will also tell you whether your anchors are describing the work at all.
Step two: blind rate, one level pair at a time
Give eight to twelve managers the incident bank and the anchors for one competency. Nothing else: no names, no current grades, no scores to reconcile. Ask each manager to rate every incident on that competency.
Two design rules make the data readable.
First, rate one competency per sitting. A manager rating nine competencies across forty incidents will pattern-match by incident, not by behaviour.
Second, include a "not demonstrated in this incident" option. Forcing a rating on an incident that does not show the behaviour manufactures variance you will then spend a meeting interpreting. The not-observed responses are themselves the finding for that competency, and treating what a rater never sees as a data problem is the same discipline in the 360 context.
Step three: read adjacent agreement before exact agreement
For each pair of raters on each incident you get two numbers.
Exact agreement is the share of incident pairs where both raters chose the identical level. This is the number that tells you whether your ladder is real.
Adjacent agreement is the share where they were one level apart or fewer. This is the number people quote when they want a comforting figure, and on its own it is nearly meaningless: with five levels, two raters picking at random land adjacent-or-better a good part of the time, and the more levels you have the easier it is to be adjacent.
| Pattern | What it means | Action |
|---|---|---|
| Exact high, adjacent high | Raters share a working definition | Leave it alone |
| Exact low, adjacent very high | Raters see a coarse difference and disagree on where the line sits | Collapse the pair into one level |
| Exact low, adjacent low | Competency or anchors are unclear, not the level count | Fix the anchors first, retest |
| Not-observed above 25 percent | The behaviour is rare, or invisible to the rater | Check whether it belongs in this role |
Then look at the distribution. If a level collects under five percent of all ratings across the bank, it is not a level, it is a rounding error. Two of those and your five-point scale is a three-point scale wearing a costume.
What it looked like at one company
Illustrative numbers, from a distribution business with 12 branches, 9 competencies and 5 levels.
Eight branch managers rated 44 incidents on "Customer ownership". The results, per adjacent level pair:
| Pair | Exact agreement | Adjacent agreement | Verdict |
|---|---|---|---|
| 1 vs 2 | 38 percent | 94 percent | Collapse |
| 2 vs 3 | 61 percent | 89 percent | Keep, weak |
| 3 vs 4 | 44 percent | 96 percent | Collapse |
| 4 vs 5 | 29 percent | 71 percent | Rewrite the anchors |
Level 5 collected 3 of 352 ratings. Level 1 collected 9. Between them, 3.4 percent of the data sat in two of the five levels.
They went to three levels. Level 1 became "does not yet", level 2 became the old 2 and 3 merged, level 3 became the old 4 and 5 merged with the old top anchor rewritten as "resolves the customer's problem without escalating, and tells the account owner what changed". Then they re-ran the test with the same 44 incidents and the same managers, two weeks later.
Exact agreement on the new three-point scale came out at 68 percent with adjacent agreement at 93 percent. Not spectacular, and a great deal more honest: a two-thirds match between managers is about what you should expect from a real behaviour rating, and it is enough to make a development conversation defensible.
Note what they did not do. They did not delete the level 5 anchor text. They merged it, and kept the wording for the top band. Collapsing levels is a mapping job, not a deletion: every historical rating on the old scale has to land somewhere on the new one, and the person holding a 4 has to be able to see what their 4 became. Renaming a competency is a migration with the same discipline: freeze the code, keep the retired label as an alias, and reconcile the counts before you announce the change.
The middle is where the scale actually lives
There is a statistical trap waiting once you start comparing agreement figures across versions, and it will make you keep a bad level.
Cohen's kappa corrects for chance agreement, which is why people reach for it. But when one category dominates the ratings, as level 3 always does, kappa collapses toward zero even when raters agree most of the time. Zec and colleagues showed this on a real quality-assessment dataset: kappa called the agreement unsatisfactory on three variables while the observed agreement was plainly high, and a chance-corrected alternative gave values in line with what the raw concordance showed.
So do not read a kappa of 0.3 on a skewed five-level scale as "my managers are unreliable". Read it as "my scale is skewed". Report exact agreement, adjacent agreement and the proportion of ratings in each level, and make decisions on that set. McHugh's review puts the widely used 80 percent benchmark for interrater agreement in the same frame: it is a floor for the raw agreement figure, not a pass mark for a scale that only ever uses its middle.
The honest limit
This test tells you whether raters can separate your levels. It does not tell you whether the levels are the right ones, and it will happily validate a three-level ladder that measures the wrong thing with high consistency.
It is also expensive enough that you should not run it on everything. Nine competencies times forty incidents times twelve raters is 4,320 judgements. Run it on the two or three competencies where the rating actually drives a decision: promotion, a development plan, a pay conversation. Where the output is a training nomination, level precision buys you little.
And it needs at least eight raters. With three or four you are measuring those three or four people, not the framework.
Do this before your next cycle
Pick the competency your managers argue about most. Ask three supervisors to write five incidents each from the last quarter, good and bad. Ask six managers to rate the fifteen incidents blind, on paper, one competency, no names.
Count how many incidents got the same level from at least four of the six. If that number is under half, you have found your problem, and it is not the anchors. It is a level count the work cannot carry.
Then look at how the framework is scored across the organisation before you rewrite anything, because a five-point scale that is being averaged into a single person score has already thrown away the disagreement you just measured.
Next step
Run the same measurement on your own team
Bring a real team and a real competency. We set up the assessment, run one cycle, and walk you through the report so you can judge the output yourself.